Loco Restoration Working Group
3rd May 2006
<-- Index | Showing 1-10 of 10 pictures | Index -->
30 April 2006 Work undertaken inside and out of replacement boiler.
30 April 2006 Work undertaken inside and out of replacement boiler.
2304x3456
C_Class_Boiler_1.jpg
30 April 2006 Boiler exterior during a lull in the needle gunning process.
30 April 2006 Boiler exterior during a lull in the needle gunning process.
2944x2248
C_Class_Boiler_2.jpg
30 April 2006 Some cab fittings removed.
30 April 2006 Some cab fittings removed.
3456x2304
C_Class_Cab_1.jpg
30th April 2006 Smokebox cleaned ready for removal of fittings.
30th April 2006 Smokebox cleaned ready for removal of fittings.
2304x3456
C_Class_Smokebox_1.jpg
30th April 2006 Smokebox ready for removal of fittings.
30th April 2006 Smokebox ready for removal of fittings.
3456x2304
C_Class_Smokebox_2.jpg
30 April 2006 Tender cleaned a good coating of bitumen applied.
30 April 2006 Tender cleaned a good coating of bitumen applied.
3456x2304
C_Class_Tender_1.jpg
17 June 2007 Cab back on
17 June 2007 Cab back on
3456x2304
IMG_1703.JPG
17 June 2007 Cab fitting was on and off
17 June 2007 Cab fitting was on and off
2304x3456
IMG_1704.JPG
17 June 2007 These pictures taken after the workshop closed for the day with only a small built in flash
17 June 2007 These pictures taken after the workshop closed for the day with only a small built in flash
2304x3456
IMG_1706.JPG
17 June 2007 Finaladjustments are still to be made
17 June 2007 Finaladjustments are still to be made
3456x2304
IMG_1707.JPG