30 April 2006 Work undertaken inside and out of replacement boiler. 2304x3456 C_Class_Boiler_1.jpg |
30 April 2006 Boiler exterior during a lull in the needle gunning process. 2944x2248 C_Class_Boiler_2.jpg |
30 April 2006 Some cab fittings removed. 3456x2304 C_Class_Cab_1.jpg |
30th April 2006 Smokebox cleaned ready for removal of fittings. 2304x3456 C_Class_Smokebox_1.jpg |
30th April 2006 Smokebox ready for removal of fittings. 3456x2304 C_Class_Smokebox_2.jpg |
30 April 2006 Tender cleaned a good coating of bitumen applied. 3456x2304 C_Class_Tender_1.jpg |
17 June 2007 Cab back on 3456x2304 IMG_1703.JPG |
17 June 2007 Cab fitting was on and off 2304x3456 IMG_1704.JPG |